• Electric Vehicle Charging Station Battery Charger Power Supply CE
  • Electric Vehicle Charging Station Battery Charger Power Supply CE
  • Electric Vehicle Charging Station Battery Charger Power Supply CE
  • Electric Vehicle Charging Station Battery Charger Power Supply CE
  • Electric Vehicle Charging Station Battery Charger Power Supply CE
  • Electric Vehicle Charging Station Battery Charger Power Supply CE

Electric Vehicle Charging Station Battery Charger Power Supply CE

Number of Charging Interfaces: One Pile with One Charge
Location: Public Use
Installation: Floor Type
Charge Method: Normal Charge
Certificate: CE
After-Sales Service: 1year Warranty
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Anhui, China
to see all verified strength labels (11)

Basic Info.

Model NO.
SCDE100-80-240-DC
Efficiency
94% (Full Load)
Maximum Input Current
155A
Charging Interface
CCS 2* or GB
Internet Connection
4G /Ethernet
Input Power Connection
3pH+N+PE(L1, L2, L3, N, PE)
Transport Package
Cardboard Box
Specification
700*1900*600mm
Trademark
SOJO or OEM
Origin
China Anhui
Production Capacity
10000

Product Description

Company Profile:



Introducing Hefei JOJO Fast Charge Technology Co., Ltd.



Hefei JOJO Fast Charge Technology Co., Ltd. is a leading enterprise in the power distribution industry in China. Our company has been recognized for our excellence, winning the "national Torch Program industrialization demonstration project certificate" and being the only enterprise in China to pass the KEMA certificate.



Since our listing on the Shenzhen Stock Exchange in April 2015 (Stock Code: 300444), we have continued to innovate and excel in the field of new energy. With multiple international invention patents, we specialize in research and development, production, sales, and operation in the new energy sector.



Our state-of-the-art 350,000 m2 digital factory, located in the heart of China, allows us to produce high-quality products efficiently. With over 2000 global employees and an annual output value exceeding 5 billion RMB, we have the experience and expertise to meet the needs of our customers.



Choose Hefei JOJO Fast Charge Technology Co., Ltd. for cutting-edge solutions in the new energy field.




Electric Vehicle Charging Station Battery Charger Power Supply CE

Product rule parameters:


 
Electric Vehicle Charging Station Battery Charger Power Supply CE


AC Charging Pile Installation Instructions



AC Charging Pile Installation Guide



For outdoor installation of the column type AC charging pile by Hefei JOJO Fast Charge Technology Co.,Ltd., follow these steps:




  1. Install a canopy on top of the equipment to prevent rainwater exposure.

  2. Drill installation holes, insert expansion bolts and waterproof rubber gaskets, secure the AC pile, and seal with nuts and sealant.

  3. Attach the gun line hook holder to the column's center fixing hole.

  4. Ensure reliable grounding to prevent electric shock hazards.

  5. Mount the column on a 20cm high foundation using expansion bolts.



By following these instructions, you can safely and effectively install the AC charging pile for convenient charging solutions.




 
Name Parameters
Rated power 60-240kw
Body size (H*W*D)
700*1900*600mm
 Input power connection 3Ph + N + PE(L1, L2, L3, N, PE)
Certification CE
AC input voltage 400 VAC ± 10%
Operating temperature
-20+50ºC
Ambient humidity
5%~95% No condensation
Maximum Output Current 155A
Length of charging guns Nominal 5 meters
Number of charging guns single gun/double guns
Protection class IP54
Input power connection 3Ph + N + PE(L1, L2, L3, N, PE)
AC input frequency 50/60Hz
HMI 7 inch LCD touch screen
Storage Temperature -20ºC~50ºC
RFID system ISO 14443 type A  MIFARE DESFire EV1
Communication Protocol OCPP 1.6
Energy meter EU MID Approved Energy meter
Safety standards IEC 61851 or GB
Internet connection 4G/Ethernet
Module Configuration Triple Harmonization Module

Project case&Certificate:

Electric Vehicle Charging Station Battery Charger Power Supply CE
Electric Vehicle Charging Station Battery Charger Power Supply CE
Electric Vehicle Charging Station Battery Charger Power Supply CE
Electric Vehicle Charging Station Battery Charger Power Supply CE
Electric Vehicle Charging Station Battery Charger Power Supply CE
Electric Vehicle Charging Station Battery Charger Power Supply CE
Electric Vehicle Charging Station Battery Charger Power Supply CE
Electric Vehicle Charging Station Battery Charger Power Supply CE
Electric Vehicle Charging Station Battery Charger Power Supply CE



Product Description



Welcome to Hefei JOJO Fast Charge Technology Co.,Ltd.



Customer Service:


Our team provides professional product advice and purchase options. You can expect a response to all emails within 24 hours on working days. We offer online customer service in English and Japanese for your convenience. Enjoy one-on-one service with us!



Storage and Transportation:


During transportation, ensure proper fastening measures to prevent damage. Upon arrival, check for any transportation damage and contact us immediately. Store equipment in a room with humidity ≤80% and temperature -10ºC~+40ºC. The storage area should be dry, clean, and well-ventilated to prevent damage.




Our factory:
Electric Vehicle Charging Station Battery Charger Power Supply CE
Electric Vehicle Charging Station Battery Charger Power Supply CE
Electric Vehicle Charging Station Battery Charger Power Supply CE




Product Description



Welcome to Hefei JOJO Fast Charge Technology Co.,Ltd.



Product: New and Sustainable Energy Applications



FAQ



Q1. Are you a factory or trading company?


A: We are a professional manufacturer of new and sustainable energy applications.



Q2. What is the warranty?


A: 12 months. In this period, we will supply technical support and replace the new parts for free, with customers in charge of delivery.



Q3. What is your terms of payment?


A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the products and packages before you pay the balance.



Q4. What is your terms of trade?


A: EXW, FOB, CFR, CIF, DAP, DDU, DDP.



Q5. How about your delivery time?


A: Generally, it will take 3 to 7 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.



Q6. Can you produce according to the samples?


A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.



Q7. What is your sample policy?


A: We can supply the sample if we have ready parts in stock, but customers have to pay the sample cost and the courier cost.



Q8. Do you test all your goods before delivery?


A: Yes, we have 100% test before delivery.




Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
500000000 RMB
Plant Area
>2000 square meters