• Sojo Split DC Charging Post for Battery Charging Station Endpoint
  • Sojo Split DC Charging Post for Battery Charging Station Endpoint
  • Sojo Split DC Charging Post for Battery Charging Station Endpoint
  • Sojo Split DC Charging Post for Battery Charging Station Endpoint
  • Sojo Split DC Charging Post for Battery Charging Station Endpoint
  • Sojo Split DC Charging Post for Battery Charging Station Endpoint

Sojo Split DC Charging Post for Battery Charging Station Endpoint

Number of Charging Interfaces: One Pile with Multiple Charges
Location: Public Use
Installation: Floor Type
Charge Method: Quick Charge
Transport Package: Cardboard Box
Specification: 500x300x1700mm
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Anhui, China
to see all verified strength labels (11)

Basic Info.

Model NO.
Z2-240/400/480-Z3
Trademark
SOJO or Customized
Origin
China
Production Capacity
10000

Product Description

Company Profile:

Hefei JOJO Fast Charge Technology Co.,Ltd.



As a leading enterprise in the power distribution industry in China, Hefei JOJO Fast Charge Technology Co.,Ltd. is dedicated to providing cutting-edge solutions in the new energy field. Our commitment to innovation and excellence has earned us recognition and accolades from both national and international organizations.



With our extensive experience in production since our establishment in 2002, we have become experts in the R & D, production, sales, and operation of new energy technologies. Our state-of-the-art 350,000 m2 digital factory, located in the heart of China, allows us to deliver high-quality products to our customers.



We are proud to be the recipient of the "National Torch Program Industrialization Demonstration Project Certificate," which highlights our position as a leader in the industry. Additionally, we are the only enterprise in China to have passed the KEMA certificate, a testament to our commitment to quality and safety.



Since our listing on the Shenzhen Stock Exchange in April 2015, our company has experienced significant growth, with an annual output value of over 5 billion RMB. Our global team comprises more than 2000 dedicated professionals who strive to provide exceptional products and services to our customers.



At Hefei JOJO Fast Charge Technology Co.,Ltd., we pride ourselves on our extensive portfolio of international invention patents, which showcase our commitment to innovation and technological advancement. These patents contribute to our ability to provide state-of-the-art solutions to meet the evolving needs of the power distribution industry.



Choose Hefei JOJO Fast Charge Technology Co.,Ltd. for reliable, innovative, and high-quality products in the new energy field. Experience the difference of working with a leading enterprise that is dedicated to powering a sustainable future.

Sojo Split DC Charging Post for Battery Charging Station Endpoint

Product rule parameters:


 
Sojo Split DC Charging Post for Battery Charging Station Endpoint



Product Description


Product Description


Introducing the high-quality and versatile product from Hefei JOJO Fast Charge Technology Co.,Ltd.


Description:



  • Can be easily installed on the foundation or on the ground.

  • The mounting surface requires pre-buried 4 M12 stainless steel bolts, with threads exposed to the ground measuring 47-53mm.

  • The installation surface should be cement hardened, ensuring a minimum hardened area of 900mmX600mm for single pile.

  • It is crucial to level the cement-hardened installation surface to ensure a perfectly even installation.

  • For the installation of anchor bolts, stainless steel nuts must be used in combination with the M12 nuts.


With its durable construction and flexible installation options, this product offers convenience and reliability. Whether you prefer to mount it on the foundation or on the ground, this product adapts to your needs. The pre-buried stainless steel bolts ensure a secure and stable installation, while the leveled cement-hardened surface guarantees a smooth and level installation. Trust in the quality of Hefei JOJO Fast Charge Technology Co.,Ltd. and choose this product for your installation requirements.



 
Name Parameters
Body size (H*W*D)
750x250x1600mm
AC Input Voltage
AC380V±15%
operating temperature
-20+50ºC
Cooling method Forced air cooling
AC power frequency 50Hz±2%
DC voltage adjustment range 200-1000VDC
Maximum output current 1200 /1400
Rated output power 240 / 400 / 480
Module configuration 20kw / 30kw
Current limit protection value ≥1.1le
Stabilization accuracy ≤±1
Ripple factor ≤±0.5
Efficiency ≥94
Harmonic content ≤5
Noises ≤70dB
relative humidity
≥94%
Maximum Output Current 1200A
Number of charging guns double guns
protection class IP54
Communications interface CAN,RS485,Ethernet port

Project Case:

Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint

Certificate:

Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint

Customer Service:


We at Hefei JOJO Fast Charge Technology Co.,Ltd. are committed to providing our customers with exceptional service. Our knowledgeable team is available to offer professional product advice and assist with purchase options. We aim to respond to all emails within 24 hours during working days. You can also reach out to our online customer service representatives in English or Japanese for easy communication. For any concerns or inquiries, feel free to contact us via email at any time. Rest assured, all our customers receive personalized, one-on-one service.





Storage and Transportation of Equipment:


When it comes to the storage and transportation of our equipment, we take utmost care to ensure its safety and integrity. During transportation, appropriate fastening measures are implemented to prevent strong vibrations and bumps that may damage the outer packaging. Upon arrival, we recommend thoroughly inspecting the equipment for any signs of damage. In the event of transportation damage, please contact both the transportation party and our company to resolve the issue amicably. Upon opening the box, it is essential to immediately verify the contents against the provided packing list.


To maintain the equipment's optimal condition, it should be stored in a room with a relative humidity of ≤80% and an ambient air temperature ranging from -10ºC to +40ºC. The storage area should be dry, clean, and well-ventilated, ensuring no intrusion of harmful gases. It is strictly prohibited to store the equipment with corrosive substances in the same vicinity.


Our factory:
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint
Sojo Split DC Charging Post for Battery Charging Station Endpoint




Product Description


Welcome to Hefei JOJO Fast Charge Technology Co.,Ltd.


Product Description


FAQ




  1. Q1. Are you a factory or trading company?


    A: We are a professional manufacturer of new and sustainable energy applications.




  2. Q2. What is the warranty?


    A: Our products come with a 12-month warranty. During this period, we provide technical support and free replacement of new parts. Customers are responsible for the delivery charges.




  3. Q3. What is your terms of payment?


    A: We require a 50% deposit via T/T, and the remaining 50% is to be paid before delivery. We will provide photos of the products and packages for your approval before you pay the balance.




  4. Q4. What is your terms of trade?


    A: Our terms of trade include EXW, FOB, CFR, CIF, DAP, DDU, and DDP.




  5. Q5. How about your delivery time?


    A: Generally, it takes 3 to 7 working days to deliver the products after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.




  6. Q6. Can you produce according to the samples?


    A: Yes, we can produce products based on your samples or technical drawings. We have the capability to build molds and fixtures.




  7. Q7. What is your sample policy?


    A: If we have ready parts in stock, we can supply the sample. However, customers need to cover the sample cost and the courier cost.




  8. Q8. Do you test all your goods before delivery?


    A: Yes, we conduct 100% testing on all our goods before delivery.





Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
500000000 RMB
Plant Area
>2000 square meters