Number of Charging Interfaces: | One Pile with Multiple Charges |
---|---|
Location: | Public Use |
Installation: | Floor Type |
Charge Method: | Quick Charge |
Transport Package: | Cardboard Box |
Specification: | 500x300x1700mm |
Customization: |
---|
Suppliers with verified business licenses
At Hefei JOJO Fast Charge Technology Co.,Ltd., we are a leading enterprise in the power distribution industry in China. With over 2000 global employees, we specialize in the research and development, production, sales, and operation in the new energy field.
Our commitment to innovation is evident through our possession of multiple international invention patents. We are proud recipients of the "national Torch Program industrialization demonstration project certificate," showcasing our dedication to advancing the industry.
As the only enterprise in China to pass the prestigious KEMA certificate, we assure our customers of the highest quality products and services. Our 350,000 m2 digital factory, located in the heart of China, enables us to deliver exceptional products with unmatched efficiency.
Since our establishment in 2002, we have gained rich experience in production, making us a reliable choice for your power distribution needs. Our annual output value exceeds 5 billion RMB, demonstrating our commitment to excellence.
Join the countless satisfied customers who have chosen Hefei JOJO Fast Charge Technology for their power distribution requirements. Contact us today to experience our superior products and exceptional service.
The product can be installed either on the foundation or on the ground. To install, pre-bury 4 M12 stainless steel bolts on the mounting surface as shown in the picture. The threads should be exposed to the ground at a height of 47-53mm.
The installation surface should be made of cement and hardened. The hardened area of a single pile should not be less than 900mmX600mm.
The cement-hardened installation surface needs to be leveled to ensure a perfectly level installation surface.
Stainless steel nuts must be used to install the M12 nuts of the anchor bolts.
Hefei JOJO Fast Charge Technology Co., Ltd.
Name | Parameters |
Body size (H*W*D) |
750x250x1600mm
|
AC Input Voltage |
AC380V±15%
|
operating temperature |
-20+50ºC
|
Cooling method | Forced air cooling |
AC power frequency | 50Hz±2% |
DC voltage adjustment range | 200-1000VDC |
Maximum output current | 1200 /1400 |
Rated output power | 240 / 400 / 480 |
Module configuration | 20kw / 30kw |
Current limit protection value | ≥1.1le |
Stabilization accuracy | ≤±1 |
Ripple factor | ≤±0.5 |
Efficiency | ≥94 |
Harmonic content | ≤5 |
Noises | ≤70dB |
relative humidity |
≥94%
|
Maximum Output Current | 1200A |
Number of charging guns | double guns |
protection class | IP54 |
Communications interface | CAN,RS485,Ethernet port |
Project Case:
Certificate:
At Hefei JOJO Fast Charge Technology Co.,Ltd., we prioritize customer satisfaction. Our team of professionals is ready to provide you with expert product advice and assist you in making the right purchase decisions. Rest assured that all your emails will receive a response within 24 hours during working days. We offer online customer service in English and Japanese, making communication easy and convenient. Feel free to contact us via email anytime. As our valued customer, you will receive personalized, one-on-one service to meet your specific needs.
When it comes to the storage and transportation of our equipment, we take utmost care to ensure its safety and integrity. During transportation, we implement appropriate fastening measures to prevent any strong vibrations or bumps that could potentially damage the outer packaging. Upon receiving the equipment, it is important to thoroughly inspect it for any signs of damage. In case of transportation damage, please reach out to both the transportation party and our company to resolve the issue promptly. Once you open the box, immediately verify if the contents align with the provided packing list.
To store the equipment, it should be placed in a room with a relative humidity of no more than 80% and an ambient air temperature ranging from -10ºC to +40ºC. The storage area should be dry, clean, and well-ventilated, preventing the entry of any harmful gases. It is strictly prohibited to store the equipment alongside corrosive substances.
Introducing our China-made Electric Vehicle Charging Post with a powerful 240kw power supply. This split DC charging post is perfect for emergency charging stations and offers universal compatibility. Get the wholesale EV charger for your charging station today!
We are a professional manufacturer of new and sustainable energy applications.
A: We are a professional manufacturer of new and sustainable energy applications.
A: We offer a 12-month warranty. During this period, we provide technical support and free replacement of new parts. Customers are responsible for the delivery charges.
A: We require a 50% deposit via T/T, and the remaining 50% before delivery. We will provide you with product and package photos before you make the final payment.
A: Our terms of trade include EXW, FOB, CFR, CIF, DAP, DDU, and DDP.
A: Generally, it takes 3 to 7 working days to deliver the products after receiving your advance payment. The specific delivery time depends on the items and quantity of your order.
A: Yes, we can produce products based on your samples or technical drawings. We have the capability to build molds and fixtures.
A: If we have ready parts in stock, we can supply a sample. However, customers need to cover the sample cost and courier charges.
A: Yes, we perform 100% testing on all our goods before delivery.
Suppliers with verified business licenses