• Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
  • Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
  • Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
  • Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
  • Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
  • Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3

Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3

Number of Charging Interfaces: One Pile with Multiple Charges
Location: Public Use
Installation: Floor Type
Charge Method: Quick Charge
Transport Package: Cardboard Box
Specification: 500x300x1700mm
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Anhui, China
to see all verified strength labels (11)

Basic Info.

Model NO.
Z2-240/400/480-Z3
Trademark
SOJO or Customized
Origin
China
Production Capacity
10000

Product Description

Company Profile:


Introducing Hefei JOJO Fast Charge Technology Co., Ltd.



  • Leading enterprises of the power distribution industry in China

  • Winner of the "national Torch Program industrialization demonstration project certificate"

  • The only enterprise in China to pass the KEMA certificate

  • Listed on the Shenzhen Stock Exchange in April 2015 (Stock Code: 300444)

  • Possesses multiple international invention patents

  • Specializes in the research and development, production, sales, and operation in the new energy field

  • Owns a state-of-the-art 350,000 m2 digital factory in the middle of China

  • Established in 2002, with rich experience in production

  • Annual output value exceeds 5 billion RMB

  • Global workforce of over 2000 people



Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3

Product rule parameters:


 
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3





Description:


The product, manufactured by Hefei JOJO Fast Charge Technology Co.,Ltd., is designed for easy installation either on a foundation or on the ground. To install, pre-bury 4 M12 stainless steel bolts according to the provided picture. The threads of the bolts should be exposed to the ground at a height of 47-53mm.


The installation surface should be cement hardened, with a minimum hardened area of 900mmX600mm for a single pile. It is important to ensure that the installation surface is leveled for proper installation.


To install the anchor bolts, stainless steel nuts must be used in conjunction with the M12 nuts.



Key Features:



  • Easy installation on foundation or ground

  • Pre-buried 4 M12 stainless steel bolts

  • Threads exposed to the ground at 47-53mm

  • Cement hardened installation surface

  • Minimum hardened area of 900mmX600mm

  • Leveled installation surface

  • Stainless steel nuts for anchor bolt installation



 
Name Parameters
Body size (H*W*D)
750x250x1600mm
AC Input Voltage
AC380V±15%
operating temperature
-20+50ºC
Cooling method Forced air cooling
AC power frequency 50Hz±2%
DC voltage adjustment range 200-1000VDC
Maximum output current 1200 /1400
Rated output power 240 / 400 / 480
Module configuration 20kw / 30kw
Current limit protection value ≥1.1le
Stabilization accuracy ≤±1
Ripple factor ≤±0.5
Efficiency ≥94
Harmonic content ≤5
Noises ≤70dB
relative humidity
≥94%
Maximum Output Current 1200A
Number of charging guns double guns
protection class IP54
Communications interface CAN,RS485,Ethernet port

Project Case:

Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3

Certificate:

Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3


Customer Service:



  • Professional product advice and purchase options

  • 24-hour email response during working days

  • Online customer service in English and Japanese

  • One-on-one service for all customers


Storage and Transportation of Equipment:


During transportation, it is important to take appropriate fastening measures to prevent strong vibrations and bumps that could damage the equipment's outer packaging. Upon arrival, please carefully inspect the equipment for any damage. In case of transportation damage, please contact both the transportation party and our company to resolve the issue. After opening the box, ensure that the contents are consistent with the provided packing list.


When storing the packed equipment, it should be kept in a room with a relative humidity of ≤80% and an ambient air temperature ranging from -10ºC to +40ºC. The storage area should be dry, clean, well-ventilated, and free from harmful gases. It is strictly prohibited to store the equipment with corrosive substances.


For any further inquiries or assistance, please feel free to contact us:



  • Email: [email protected]

  • Online customer service


Thank you for choosing Hefei JOJO Fast Charge Technology Co.,Ltd.



Our factory:
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3
Sojo Split DC Charging Post for Emergency Charging Station Endpoint Z3




Product Description


Product Description


Welcome to Hefei JOJO Fast Charge Technology Co.,Ltd.! We are a professional manufacturer of new and sustainable energy applications.


FAQ




  1. Q1. Are you a factory or trading company?


    A: We are a professional manufacturer of new and sustainable energy applications.




  2. Q2. What is the warranty?


    A: Our products come with a 12-month warranty. During this period, we provide technical support and replace any new parts for free. Customers are responsible for the delivery charges.




  3. Q3. What is your terms of payment?


    A: We require a 50% deposit via T/T (bank transfer) before delivery, and the remaining 50% should be paid before shipment. We will provide you with photos of the products and packages before you make the final payment.




  4. Q4. What is your terms of trade?


    A: We offer various terms of trade, including EXW, FOB, CFR, CIF, DAP, DDU, and DDP.




  5. Q5. How about your delivery time?


    A: Typically, it takes 3 to 7 working days to deliver your order after receiving the advance payment. The specific delivery time depends on the items and the quantity you have ordered.




  6. Q6. Can you produce according to the samples?


    A: Yes, we can produce products based on your samples or technical drawings. We have the capability to build molds and fixtures as required.




  7. Q7. What is your sample policy?


    A: If we have ready parts in stock, we can supply a sample. However, customers need to cover the sample cost and courier charges.




  8. Q8. Do you test all your goods before delivery?


    A: Yes, we conduct a 100% test on all our goods before delivery to ensure their quality.





Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
500000000 RMB
Plant Area
>2000 square meters