• Sojo 240kw\400kw\480kw Split DC Charging Post
  • Sojo 240kw\400kw\480kw Split DC Charging Post
  • Sojo 240kw\400kw\480kw Split DC Charging Post
  • Sojo 240kw\400kw\480kw Split DC Charging Post
  • Sojo 240kw\400kw\480kw Split DC Charging Post
  • Sojo 240kw\400kw\480kw Split DC Charging Post

Sojo 240kw\400kw\480kw Split DC Charging Post

Number of Charging Interfaces: One Pile with Multiple Charges
Location: Public Use
Installation: Floor Type
Charge Method: Quick Charge
Transport Package: Cardboard Box
Specification: 500x300x1700mm
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Anhui, China
to see all verified strength labels (11)

Basic Info.

Model NO.
Z2-240/400/480-Z3
Trademark
SOJO or Customized
Origin
China
Production Capacity
10000

Product Description

Company Profile:


Introducing Hefei JOJO Fast Charge Technology Co.,Ltd.



  • Leading enterprises of power distribution industry in China

  • Winner of the "national Torch Program industrialization demonstration project" certificate

  • The only enterprise in China to pass the KEMA certificate

  • Listed on the Shenzhen Stock Exchange in April 2015 (Stock Code: 300444)

  • Possesses multiple international invention patents

  • Specializes in the R & D, production, sales, and operation in the new energy field

  • Owning a 350,000 m2 digital factory in the middle of China

  • Established in 2002 with rich experience in production

  • Annual output value over 5 billion RMB

  • Global workforce of more than 2000 people



Sojo 240kw\400kw\480kw Split DC Charging Post

Product rule parameters:


 
Sojo 240kw\400kw\480kw Split DC Charging Post



Product Description


Description



  • Can be installed on the foundation or on the ground

  • The mounting surface should have four M12 stainless steel bolts pre-buried according to the provided reference image

  • The threads of the bolts should be exposed to the ground between 47-53mm

  • The installation surface should be a cement-hardened area, with a minimum size of 900mmX600mm for single pile

  • The cement-hardened installation surface must be leveled to ensure a level installation surface

  • Stainless steel nuts must be used to install the M12 nuts of the anchor bolts



Company Information


Company Name: Hefei JOJO Fast Charge Technology Co.,Ltd.



 
Name Parameters
Body size (H*W*D)
750x250x1600mm
AC Input Voltage
AC380V±15%
operating temperature
-20+50ºC
Cooling method Forced air cooling
AC power frequency 50Hz±2%
DC voltage adjustment range 200-1000VDC
Maximum output current 1200 /1400
Rated output power 240 / 400 / 480
Module configuration 20kw / 30kw
Current limit protection value ≥1.1le
Stabilization accuracy ≤±1
Ripple factor ≤±0.5
Efficiency ≥94
Harmonic content ≤5
Noises ≤70dB
relative humidity
≥94%
Maximum Output Current 1200A
Number of charging guns double guns
protection class IP54
Communications interface CAN,RS485,Ethernet port

Project Case:

Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post

Certificate:

Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post

Customer Service:


At Hefei JOJO Fast Charge Technology Co., Ltd., we pride ourselves on providing exceptional customer service. Our team of professionals is here to offer expert product advice and assist you in making the right purchase decision.


Rest assured that when you reach out to us via email, you will receive a prompt response within 24 hours during working days. Our dedicated online customer service is available in both English and Japanese, ensuring seamless communication. Alternatively, you can contact us via email at any time.


With us, every customer receives personalized one-on-one service to ensure your satisfaction.



Storage and Transportation of Equipment:


When it comes to the storage and transportation of our equipment, we take every precaution to ensure its safety.


During transportation, we implement corresponding fastening measures to prevent any strong vibrations or bumps that could potentially damage the outer packaging of the equipment.


Upon arrival, it is essential to carefully inspect the equipment for any transportation damage. In the event of damage, please contact both the transportation party and our company for prompt resolution.


Before using the equipment, please open the box and verify that the contents are consistent with the provided packing list.


For proper storage, we recommend keeping the packed equipment in a room with a relative humidity of ≤80% and an ambient air temperature ranging from -10ºC to +40ºC.


The storage area should be dry, clean, well-ventilated, and free from the intrusion of harmful gases. It is strictly forbidden to store the equipment alongside corrosive substances.



Choose Hefei JOJO Fast Charge Technology Co., Ltd. for exceptional customer service and reliable storage and transportation practices.

Our factory:
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post
Sojo 240kw\400kw\480kw Split DC Charging Post




Product Description


Product Description


Hefei JOJO Fast Charge Technology Co.,Ltd. is a professional manufacturer of new and sustainable energy applications.


FAQ



Q1. Are you a factory or trading company?
A: We are a professional manufacturer of new and sustainable energy applications.

Q2. What is the warranty?
A: Our products come with a 12-month warranty. Within this period, we offer technical support and free replacement of new parts. Customers are responsible for the delivery charges.

Q3. What are your terms of payment?
A: We require a 50% deposit via T/T, and the remaining 50% before delivery. We will provide you with product and package photos before you make the final payment.

Q4. What are your terms of trade?
A: We offer various terms of trade including EXW, FOB, CFR, CIF, DAP, DDU, and DDP.

Q5. How long is your delivery time?
A: Generally, it takes 3 to 7 working days to deliver the products after receiving the advance payment. The specific delivery time depends on the items and the quantity of your order.

Q6. Can you produce according to samples?
A: Yes, we can produce based on your samples or technical drawings. We have the capability to build molds and fixtures.

Q7. What is your sample policy?
A: If we have ready parts in stock, we can provide samples. However, customers need to cover the sample cost and courier charges.

Q8. Do you test all your goods before delivery?
A: Yes, we conduct 100% testing on all our products before delivery.


Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
500000000 RMB
Plant Area
>2000 square meters